bound4blue Retrofit / Upgrade / Repower
eSAIL® turnkey installation and retrofit
Turnkey service covering preliminary study, arrangement, design and class approval, vessel preparation and installation of eSAILs® on newbuild and existing ships.
Description
The process has six steps: preliminary study, selection of the optimal sail arrangement, installation design and approval by Class and Flag State, vessel preparation (foundations and cabling), installation of the sails, and operation. Preparation takes 1-2 weeks and can be done in a scheduled dry-dock.
Sails are bolted onto foundations and can be installed during dry-dock or afloat at a port call. A free preliminary business case estimates savings and ROI.
Specifications
| Vessel preparation time | 1-2 weeks |
|---|
More from bound4blue
Featured services
All services →Engineering & Design
Dry Dock and Transfer System Design
Design of marine railway dry docks, side-haul railways, floating dry docks and ship transfer systems, including restoration and enlargement.
Inspection, Survey & Testing
Hose Testing & Certification
Hydrostatic, proof/burst, vacuum, twist, elongation, pull and underwater leak testing with reports and certifications, to MIL-I-45208 and/or ISO 9001:2015.
Training
RulesCalc Software Training Course
Three-day hands-on Lloyd's Register course on RulesCalc software for scantling calculations and prescriptive checks under LR Rules for the Classification of Ships.
Similar services