Liferaft Systems Australia Installation & Commissioning
Installation Support
Installation drawings and support; a typical MES installation takes 1-2 days.
Description
Each installation is accompanied by detailed drawings from the LSA Design Department, prepared with the ship owner, shipyard or designer. A typical installation takes only 1-2 days with minimal disruption to newbuild or repair programmes.
Key features
- No winches, hydraulics or connection to ship's power required
- Fixed-length bowsing lines pre-determined by the design team
- Unit can be installed inside the main passenger area or on an open deck
More from Liferaft Systems Australia
Featured services
All services →Engineering & Design
Dry Dock and Transfer System Design
Design of marine railway dry docks, side-haul railways, floating dry docks and ship transfer systems, including restoration and enlargement.
Repair & Overhaul
Marine Repair Services (Virginia Division)
Mechanical service, repowering, rescue boat inspection, electronics installation and refurbishment of small boats in Portsmouth, Virginia.
Other service
Service Parts
OEM replacement components, sub-assemblies and retrofit kits for H.O. Bostrom seats, ordered by seat serial number.
Similar services